The competent person selects a simple sloped system for Type B soil in an excavation under 20 ft deep. Which maximum slope ratio matches OSHA Appendix B?
Correct Answer
A) 1 horizontal to 1 vertical
OSHA Subpart P Appendix B Table B-1 lists the maximum allowable simple slope for Type B soil as 1 horizontal to 1 vertical. Other choices are Type A, Type C, or a flatter project-specific slope.
Why This Is the Correct Answer
OSHA Subpart P Appendix B Table B-1 lists the maximum allowable simple slope for Type B soil as 1 horizontal to 1 vertical. Other choices are Type A, Type C, or a flatter project-specific slope.
Why the Other Options Are Wrong
Option B: 3/4 horizontal to 1 vertical
The trap in B is 3/4 horizontal to 1 vertical. That selection is wrong because 3/4 horizontal to 1 vertical is a different drainage slope than the pipe size in the item; the accepted slope is 1 horizontal to 1 vertical; Type B simple slope is 1H:1V for excavations less than 20 ft deep.
Option C: 1-1/2 horizontal to 1 vertical
Choice C gives 1-1/2 horizontal to 1 vertical. Its specific error: 1-1/2 horizontal to 1 vertical is a different drainage slope than the pipe size in the item; the accepted slope is 1 horizontal to 1 vertical. The accepted answer is 1 horizontal to 1 vertical.
Option D: 2 horizontal to 1 vertical
Choice D (2 horizontal to 1 vertical) is rejected because 2 horizontal to 1 vertical is a different drainage slope than the pipe size in the item; the accepted slope is 1 horizontal to 1 vertical. The cited answer is 1 horizontal to 1 vertical.
Memory Technique
Treat type B soil slope like a labeled shelf; only the matching condition belongs with 1 horizontal to 1 vertical.
Reference Hint
Open 29 CFR Part 1926, Subpart P - Excavations; use 29 CFR 1926 Subpart P Appendix B, Table B-1 to confirm that OSHA Subpart P Appendix B Table B-1 lists the maximum allowable simple slope for Type B soil as 1 horizontal to 1 vertical.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?