The instructions require performance and payment bonds after award. What must the apparent low bidder be able to furnish?
Correct Answer
C) Required post-award bonds from an acceptable surety.
Post-award bonding requirements are part of bidder responsibility and contract execution.
Why This Is the Correct Answer
Post-award bonding requirements are part of bidder responsibility and contract execution.
Why the Other Options Are Wrong
Option A: Limit performance bond before award to a material sample only
Choice A gives Only a material sample. Its specific error: the option delays or omits the controlling step.
Option B: Base the performance bond before award response on a verbal promise
Choice B (Only a verbal promise) is rejected because the action skips the timing, documentation, or field-control step needed for Performance bond before award.
Option D: Use a later change request to handle performance bond before award after award
The trap in D is Only a punch-list schedule. That selection is wrong because it leaves the work at an informal or incomplete stage, while Performance bond before award requires Required post-award bonds from an acceptable surety.; The successful bidder must furnish required performance and payment bonds.
Memory Technique
Pair performance bond before award with the real field trigger, then choose the response that produces Required post-award bonds from an acceptable surety.
Reference Hint
Open NASCLA Contractors Guide to Business, Law and Project Management, 14th Ed.; use the index entry or section for "Post-award bonds" to confirm that Post-award bonding requirements are part of bidder responsibility and contract execution.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?