Before the procurement meeting closes, who normally decides whether listed alternates are accepted when awarding the contract?
Correct Answer
B) The owner under the bid and contract documents
The owner under the bid and contract documents is the controlling requirement: the distractors are related-looking contract or field terms, but they do not match the cited requirement for review item 253.
Why This Is the Correct Answer
The owner under the bid and contract documents is the controlling requirement
Why the Other Options Are Wrong
Option A: Base the alternate acceptance response on the low subcontractor only
In procurement and contracting, The low subcontractor only is the wrong selection for Alternate acceptance: the action skips the timing, documentation, or field-control step needed for Alternate acceptance.
Option C: Make the building inspector the answer for alternate acceptance
Choice C gives The building inspector. Its specific error: the choice would not get the project.
Option D: Apply the surety after final payment to the alternate acceptance condition
Choice D (The surety after final payment) is rejected because the option delays or omits the controlling step.
Memory Technique
Make alternate acceptance a tabbed card: cite the exact condition, then choose The owner under the bid and contract documents.
Reference Hint
Open Construction Project Management, 5th Ed. (2022); use the index entry or section for "Alternates and award" to confirm that The owner under the bid and contract documents is the controlling requirement
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass