Unauthorized visitors enter the site after hours. What project control should be strengthened?
Correct Answer
D) Fencing, signage, gates, lighting, and access procedures.
Site security and public protection controls reduce unauthorized access hazards.
Why This Is the Correct Answer
Site security and public protection controls reduce unauthorized access hazards.
Why the Other Options Are Wrong
Option A: Limit access control after hours to the bid alternates form
The trap in A is The bid alternates form only. That selection is wrong because the option delays or omits the controlling step.
Option B: Base the access control after hours response on the final lien waiver only
Choice B gives The final lien waiver only. Its specific error: the action skips the timing, documentation, or field-control step needed for Access control after hours.
Option C: Treat the condition as requiring no control if no work is underway
Choice C (No control if no work is underway.) is rejected because the option does not produce the required Access control after hours outcome, Fencing, signage, gates, lighting, and access procedures.
Memory Technique
Use the phrase "problem, control, result" for access control after hours; the result side is Fencing, signage, gates, lighting, and access procedures.
Reference Hint
Open Construction Jobsite Management, 5th Ed. (2024); use by topic index - site logistics / temporary facilities / public protection to confirm that Site security and public protection controls reduce unauthorized access hazards.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?