A quality-control review flags the following point: a crew of 3 workers spends 8 hours per day for 3 days on temporary protection. How many labor-hours are recorded?
Correct Answer
B) 72 labor-hours
The calculation gives 72 labor-hours for the stated labor-hours. Other choices: the distractors come from omitting an adjustment, using the wrong rate, or applying a rounded shortcut for calculation item 199.
Why This Is the Correct Answer
The calculation gives 72 labor-hours for the stated labor-hours.
Why the Other Options Are Wrong
Option A: 72 labor-hours (unadjusted)
labor-hours, choice a: 72 labor-hours (unadjusted) repeats the numeric result but changes the required label or rounding; 3 x 8 x 3 = 72. so the keyed form is 72 labor-hours.
Option C: 64
labor-hours, choice c: 64 backs into 8 when divided by 8; the accepted setup gives 9 on that same base.
Option D: 79
labor-hours, choice d: 79 backs into 9.88 when divided by 8; the accepted setup gives 9 on that same base.
Memory Technique
Keep a inspection mark beside labor-hours: if one number is skipped, the option drifts away from 72 labor-hours.
Reference Hint
Open Construction Jobsite Management, 5th Ed.; use the index entry or section for "labor-hours calculation" to confirm that The calculation gives 72 labor-hours for the stated labor-hours.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?