A Palm Bay crew will work at an unprotected roof edge 7 ft above the lower level. Which control should be in place before work begins?
Correct Answer
B) fall protection system
At the stated height, employees at an unprotected edge need an approved fall protection method.
Why This Is the Correct Answer
At the stated height, employees at an unprotected edge need an approved fall protection method.
Why the Other Options Are Wrong
Option A: a sign at the roof edge
a sign at the roof edge may relate to another site control, but it does not remove or guard the fall protection trigger exposure being tested.
Option C: a spotter for the worker
a spotter for the worker may relate to another site control, but it does not remove or guard the fall protection trigger exposure being tested.
Option D: a toeboard at the edge
a toeboard at the edge may relate to another site control, but it does not remove or guard the fall protection trigger exposure being tested.
Memory Technique
the controlling choice Trigger lock for Superintendent Checks: height is the harm, employees is the guard.
Reference Hint
Open-book path: tab OSHA 29 CFR 1926 to Subpart M, 1926.501 Duty to have fall protection; verify the OSHA safety threshold or jobsite control before answering.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The Eustis site has this emergency-readiness issue: emergency contact sheet is missing. Which safety control should be corrected?
Next Question
For the field-takeoff reconciliation at the restaurant grease-interceptor area, the overhead pipe rack is 198 ft long and hangers are placed at 8 ft on center, including one at the starting end. How many hangers are needed?