The Daytona Beach job has this temporary-power condition: wet work area uses cord-connected equipment. Which safety control should the superintendent verify?
Correct Answer
B) wet-area electrical protection
Construction temporary power must control shock exposure through GFCI or an allowed assured equipment grounding program.
Why This Is the Correct Answer
Construction temporary power must control shock exposure through GFCI or an allowed assured equipment grounding program.
Why the Other Options Are Wrong
Option A: elevate the cords only
elevate the cords only may relate to another site control, but it does not remove or guard the temporary power protection exposure being tested.
Option C: dry it and skip GFCI
dry it and skip GFCI may relate to another site control, but it does not remove or guard the temporary power protection exposure being tested.
Option D: a wet-area caution sign
a wet-area caution sign may relate to another site control, but it does not remove or guard the temporary power protection exposure being tested.
Memory Technique
Name the harm before the guard; elevate, cords, only cannot stand in for Superintendent Checks.
Reference Hint
Open-book path: tab OSHA 29 CFR 1926 to Subpart K, 1926.404 Wiring design and protection; verify the OSHA safety threshold or jobsite control before answering.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The construction team is coordinating a method decision because membrane adhesion depends on substrate condition. Which roof substrate readiness is best?
Next Question
During the pre-installation review, the field issue is that the work should be released only if the team addresses that routine moisture is expected behind ceramic tile. Which tile substrate is the best match?