During the pre-installation review, the field issue is that the work should be released only if the team addresses that routine moisture is expected behind ceramic tile. Which tile substrate is the best match?
Correct Answer
D) Coordinate cementitious or specified tile backer
cementitious or specified tile backer best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
cementitious or specified tile backer best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Coordinate untreated paper-faced gypsum board
Coordinate untreated paper-faced gypsum board addresses a neighboring field issue, but not the condition or method control required for wet tile substrate.
Option B: Coordinate regular gypsum sheathing
Coordinate regular gypsum sheathing addresses a neighboring field issue, but not the condition or method control required for wet tile substrate.
Option C: Coordinate painted gypsum board without backer membrane
Coordinate painted gypsum board without backer membrane addresses a neighboring field issue, but not the condition or method control required for wet tile substrate.
Memory Technique
Wet Tile Substrate method for Manager Checking: condition first, tool second.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Interior finish materials; tile backer and wet-area substrate selection; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The Daytona Beach job has this temporary-power condition: wet work area uses cord-connected equipment. Which safety control should the superintendent verify?
Next Question
The work plan must account for this condition: the controlling field constraint is that sealant depth and bond-break control are needed. Which joint accessory is most suitable?