The Sanford job has this respirable-dust condition: dry cutting concrete produces visible dust. Which safety control should be used?
Correct Answer
B) dust-control method
Silica-producing tasks require dust controls and housekeeping methods that reduce exposure.
Why This Is the Correct Answer
Silica-producing tasks require dust controls and housekeeping methods that reduce exposure.
Why the Other Options Are Wrong
Option A: cut faster to beat the dust
cut faster to beat the dust may relate to another site control, but it does not remove or guard the silica exposure control exposure being tested.
Option C: open the doors for airflow
open the doors for airflow may relate to another site control, but it does not remove or guard the silica exposure control exposure being tested.
Option D: issue cloth bandanas
issue cloth bandanas may relate to another site control, but it does not remove or guard the silica exposure control exposure being tested.
Memory Technique
Silica Exposure lock for Safety Coordinator: silica-producing is the harm, tasks is the guard.
Reference Hint
Open-book path: tab OSHA 29 CFR 1926 to Subpart Z, 1926.1153 Respirable crystalline silica; verify the OSHA safety threshold or jobsite control before answering.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
For the preconstruction estimate lock at the cafeteria dishwashing alcove, the open ceiling area for dryfall ceiling paint is 19150 SF and requires 1 coat. At 325 SF per gallon, how many gallons are required?
Next Question
The construction team is coordinating a method decision because groundwater must be lowered before footing work starts. Which water-control method is best?