While preparing the material-order review for the retail demising-wall phase, the slab strip is 138 ft long and saw-cut joints are placed at 5 ft on center, including one at the starting end. How many saw-cut joints are needed?
Correct Answer
B) 28 saw-cut joints
Count the spaces along the run, then include the starting item.
Why This Is the Correct Answer
Count the spaces along the run, then include the starting item.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the area summary schedule, what occupancy is listed for Zone D?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
From the light fixture schedule, what mount is listed for L1?
Next Question
During the buyout verification pass at the middle-school kitchen line, the #6 grade-beam bars takeoff has 150 bars at 36 ft each. Using 1.502 lb per ft for beam reinforcement, what reinforcing weight is estimated?