During the buyout verification pass at the middle-school kitchen line, the #6 grade-beam bars takeoff has 150 bars at 36 ft each. Using 1.502 lb per ft for beam reinforcement, what reinforcing weight is estimated?
Correct Answer
C) 8,111 lb
Reinforcing weight equals bar count times length times pounds per foot.
Why This Is the Correct Answer
Reinforcing weight equals bar count times length times pounds per foot.
Why the Other Options Are Wrong
Option A: 5,400 lb
5,400 lb is below the supported result for #6 grade-beam bars; it likely omits allowance, conversion, coverage, or final round-up.
Option B: 225 lb
225 lb is below the supported result for #6 grade-beam bars; it likely omits allowance, conversion, coverage, or final round-up.
Option D: 9,084 lb
9,084 lb is above the supported result for #6 grade-beam bars; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Concrete Estimator takeoff: count the condition before counting the package.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Reinforcing steel; beam bar weight; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
While preparing the material-order review for the retail demising-wall phase, the slab strip is 138 ft long and saw-cut joints are placed at 5 ft on center, including one at the starting end. How many saw-cut joints are needed?
Next Question
The field condition is: the project condition shows that fresh concrete must flow around congested reinforcement. Which consolidation method best matches the condition?