During the material-order review at the urgent-care ambulance canopy, the deck area for the temporary dry-in totals 1840 SF. With 15% waste, how many roofing squares are needed?
Correct Answer
A) 21.2 squares
Roofing squares equal roof square feet with waste divided by 100.
Why This Is the Correct Answer
Roofing squares equal roof square feet with waste divided by 100.
Why the Other Options Are Wrong
Option B: 18.4 squares
18.4 squares is below the supported result for temporary dry-in; it likely omits allowance, conversion, coverage, or final round-up.
Option C: 235.1 squares
235.1 squares is above the supported result for temporary dry-in; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Option D: 29.2 squares
29.2 squares is above the supported result for temporary dry-in; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Measure to roofing, adjust for controlling, then let Roofing Estimator set the finish line.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Roofing temporary protection; square takeoff; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
A Florida superintendent must choose the proper site material because the controlling field constraint is that root growth must be redirected. Which option is best?
Next Question
In the look-ahead meeting, the constraint is that long-lead item needs early coordinated release. Which procurement sequence should the project team carry?