For the material-order review at the industrial mezzanine landing, the subgrade stabilization area for geotextile fabric covers 31550 SF, with 5% added for laps and cuts. Each roll covers 1350 SF. How many rolls are needed?
Correct Answer
C) 25 rolls
Roll count equals adjusted area divided by roll coverage, rounded up.
Why This Is the Correct Answer
Roll count equals adjusted area divided by roll coverage, rounded up.
Why the Other Options Are Wrong
Option A: 23 rolls
23 rolls is below the supported result for geotextile fabric; it likely omits allowance, conversion, coverage, or final round-up.
Option B: 26 rolls
26 rolls is above the supported result for geotextile fabric; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Option D: 24 rolls
24 rolls is below the supported result for geotextile fabric; it likely omits allowance, conversion, coverage, or final round-up.
Memory Technique
Estimator Checks takeoff: count the condition before counting the package Tie the cue to Geotextile Fabric Estimator Checks.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Earthwork; geotextile roll coverage; verify the construction method, material quantity, equipment use, unit conversion, or field-control calculation.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
For the subcontractor quantity check at the bank drive-through canopy, the #6 grade-beam bars takeoff has 87 bars at 24 ft each. Using 1.502 lb per ft for beam reinforcement, what reinforcing weight is estimated?
Next Question
The field condition is: the project condition shows that ceiling needs aligned layout and support. Which ceiling layout method best matches the condition?