The field condition is: the work should be released only if the team addresses that adhesive anchors rely on bond to concrete. Which hole preparation best matches the condition?
Correct Answer
D) Coordinate clean holes per anchor instructions
clean holes per anchor instructions best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
clean holes per anchor instructions best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Coordinate brush and blow sequence per manufacturer
Coordinate brush and blow sequence per manufacturer does not satisfy the required party, deadline, proof, license, bond, insurance, or agency trigger for adhesive anchor prep.
Option B: Coordinate dry-hole preparation procedure
Coordinate dry-hole preparation procedure does not satisfy the required party, deadline, proof, license, bond, insurance, or agency trigger for adhesive anchor prep.
Option C: Coordinate damp-hole preparation procedure
Coordinate damp-hole preparation procedure does not satisfy the required party, deadline, proof, license, bond, insurance, or agency trigger for adhesive anchor prep.
Memory Technique
Manager Checking envelope: right person, right date, right contents.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Anchoring methods; drilled-hole cleaning for adhesive anchors; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
For the field-takeoff reconciliation at the medical-office imaging room, the metal-deck pins scope includes 462 deck sheets, with 18 fasteners per item. Boxes contain 900 fasteners. How many boxes are needed?
Next Question
For the buyout verification pass at the radiology equipment platform, a paint crew must complete 10300 SF of block-filler wall area. If planned production is 5100 SF per day, how many whole work days should be scheduled?