In the look-ahead meeting, the constraint is that the controlling field constraint is that materials must move without damaging work or access. Which logistics method should the project team carry?
Correct Answer
C) Select staging plan with protected travel path
staging plan with protected travel path best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
staging plan with protected travel path best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Select stockpile blocking emergency access
Select stockpile blocking emergency access belongs to a different file or record trail; it does not prove the material staging path event.
Option B: Select deliver materials before dry storage exists
Select deliver materials before dry storage exists belongs to a different file or record trail; it does not prove the material staging path event.
Option D: Select stage pallets on finished flooring without protection
Select stage pallets on finished flooring without protection belongs to a different file or record trail; it does not prove the material staging path event.
Memory Technique
Material Staging Path proof for Manager Checking: event, approval, receipt, follow-up.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Construction logistics; material staging and handling; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
Before releasing the work, the team identifies this condition: water collected by flashing must drain out. Which cavity-wall accessory fits best?
Next Question
For the buyout verification pass at the surgery-suite support room, the slab-on-grade footprint for vapor retarder covers 42550 SF, with 5% added for laps and cuts. Each roll covers 1000 SF. How many rolls are needed?