The construction team is coordinating a method decision because the controlling field constraint is that bars must be cut and bent accurately. Which reinforcing tool is best?
Correct Answer
A) Select rebar cutter and bender
rebar cutter and bender best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
rebar cutter and bender best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option B: Select portable rebar cutter
Select portable rebar cutter addresses a neighboring field issue, but not the condition or method control required for rebar cutting bending.
Option C: Select manual bar bender for small bars
Select manual bar bender for small bars addresses a neighboring field issue, but not the condition or method control required for rebar cutting bending.
Option D: Select shop-fabricated bent bars
Select shop-fabricated bent bars addresses a neighboring field issue, but not the condition or method control required for rebar cutting bending.
Memory Technique
The field condition asks; rebar cutting bending answers in work boots for Manager Checking.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Reinforcing steel tools; cutting and bending bars; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions · 70% to pass
Contract Administration
60 questions · 70% to pass
Related Study Resources
Previous Question
For the next-week procurement cycle at the radiology equipment platform, the wall backup area for air-barrier sheet covers 17550 SF, with 10% added for laps and cuts. Each roll covers 500 SF. How many rolls are needed?
Next Question
A subcontractor asks for direction after noting that the project condition shows that joint must resist water passage through concrete. Which waterstop material best fits the work?