Before releasing the work, the team identifies this condition: the controlling field constraint is that placement must reach over a congested area. Which concrete placement equipment fits best?
Correct Answer
A) Select boom pump for reach over obstruction
boom pump for reach over obstruction best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
boom pump for reach over obstruction best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option B: Select line pump for short hose placement
Select line pump for short hose placement addresses a neighboring field issue, but not the condition or method control required for concrete pump choice.
Option C: Select crane bucket for isolated heavy lift
Select crane bucket for isolated heavy lift addresses a neighboring field issue, but not the condition or method control required for concrete pump choice.
Option D: Select wheelbarrow placement for small accessible patch
Select wheelbarrow placement for small accessible patch addresses a neighboring field issue, but not the condition or method control required for concrete pump choice.
Memory Technique
The field condition asks; concrete pump choice answers in work boots for Manager Checking.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Concrete tools; pump placement method selection; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The construction team is coordinating a method decision because the controlling field constraint is that unpaved site delivery is expected. Which forklift selection is best?
Next Question
The work plan must account for this condition: the controlling field constraint is that sound control needs continuous cavity fill. Which insulation placement is most suitable?