The construction team is coordinating a method decision because the controlling field constraint is that unpaved site delivery is expected. Which forklift selection is best?
Correct Answer
C) Select rough-terrain forklift
rough-terrain forklift best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
rough-terrain forklift best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Select warehouse cushion-tire forklift
Select warehouse cushion-tire forklift addresses a neighboring field issue, but not the condition or method control required for forklift terrain.
Option B: Select pallet jack over loose subgrade
Select pallet jack over loose subgrade addresses a neighboring field issue, but not the condition or method control required for forklift terrain.
Option D: Select telescopic handler where reach is not needed
Select telescopic handler where reach is not needed addresses a neighboring field issue, but not the condition or method control required for forklift terrain.
Memory Technique
Controlling is the clue; condition is the method check for Manager Checking Tie the cue to Terrain Manager Checking Material.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Tools and equipment; forklift selection by site surface; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
