In the look-ahead meeting, the constraint is that the controlling field constraint is that curb alignment must be controlled. Which site concrete forming method should the project team carry?
Correct Answer
C) Select secure curb forms to line and grade
secure curb forms to line and grade best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
secure curb forms to line and grade best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
For the preconstruction estimate lock at the university bookstore shell, a drywall crew must complete 17050 SF of abuse-resistant board area. If planned production is 1230 SF per day, how many whole work days should be scheduled?
Next Question
The Deerfield Beach site has this emergency-readiness issue: site access for ambulance is blocked. Which safety control should be corrected?