The construction team is coordinating a method decision because the controlling field constraint is that substrate movement must be honored. Which tile joint detail is best?
Correct Answer
A) Select movement joints carried through tile work
movement joints carried through tile work best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
movement joints carried through tile work best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option B: Material choice: Select grouted solid joint at control break
Material choice: Select grouted solid joint at control break relies on the wrong note, symbol, sheet, scale, or detail path for tile movement joints.
Option C: Select thinset packed into expansion joint
Select thinset packed into expansion joint relies on the wrong note, symbol, sheet, scale, or detail path for tile movement joints.
Option D: Select caulk omitted at changes in plane
Select caulk omitted at changes in plane relies on the wrong note, symbol, sheet, scale, or detail path for tile movement joints.
Memory Technique
Manager Checking is an address; follow it to the real instruction.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Tile methods; movement joint coordination; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
For the buyout verification pass at the radiology equipment platform, a paint crew must complete 10300 SF of block-filler wall area. If planned production is 5100 SF per day, how many whole work days should be scheduled?
Next Question
A subcontractor asks for direction after noting that the project condition shows that base plate needs load-bearing grout. Which grout material best fits the work?