Before releasing the work, the team identifies this condition: the controlling field constraint is that a narrow vertical trench needs worker entry and cannot be laid back. Which excavation protection fits best?
Correct Answer
C) Select engineered trench box or shoring
engineered trench box or shoring best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
engineered trench box or shoring best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Select sloping or benching where space permits
Select sloping or benching where space permits may relate to another site control, but it does not remove or guard the trench protective system exposure being tested.
Option B: Select hydraulic shoring for trench walls
Select hydraulic shoring for trench walls may relate to another site control, but it does not remove or guard the trench protective system exposure being tested.
Option D: Select trench shield set by competent-person direction
Select trench shield set by competent-person direction may relate to another site control, but it does not remove or guard the trench protective system exposure being tested.
Memory Technique
Name the harm before the guard; sloping, benching, space cannot stand in for Manager Checking.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Earthwork methods; trench protection and excavation support; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
In the look-ahead meeting, the constraint is that the controlling field constraint is that fresh concrete must flow around congested reinforcement. Which consolidation method should the project team carry?
Next Question
From the area summary schedule, what occupancy is listed for Zone D?