EstatePass
Project MgmtConstructionmedium63% of exam part

Before releasing the work, the team identifies this condition: the controlling field constraint is that a narrow vertical trench needs worker entry and cannot be laid back. Which excavation protection fits best?

Correct Answer

C) Select engineered trench box or shoring

engineered trench box or shoring best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.

Answer Options
A
Select sloping or benching where space permits
B
Select hydraulic shoring for trench walls
C
Select engineered trench box or shoring
D
Select trench shield set by competent-person direction

Why This Is the Correct Answer

engineered trench box or shoring best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.

Was this explanation helpful?

More Project Mgmt Questions

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your Florida General Contractor exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.