During the pre-installation review, the field issue is that the project condition shows that movement or separation is intended. Which bond breaker material is the best match?
Correct Answer
A) Use specified bond breaker where separation is intended
specified bond breaker where separation is intended best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
specified bond breaker where separation is intended best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option B: Use bond breaker at bonded topping
Use bond breaker at bonded topping does not satisfy the required party, deadline, proof, license, bond, insurance, or agency trigger for bond breaker use.
Option C: Material choice: Use curing compound where adhesive bond is needed
Material choice: Use curing compound where adhesive bond is needed does not satisfy the required party, deadline, proof, license, bond, insurance, or agency trigger for bond breaker use.
Option D: Use release agent on reinforcing steel
Use release agent on reinforcing steel does not satisfy the required party, deadline, proof, license, bond, insurance, or agency trigger for bond breaker use.
Memory Technique
Foreman Selecting envelope: right person, right date, right contents.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Concrete materials; bond breakers and curing interactions; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The work plan must account for this condition: the controlling field constraint is that sealant depth and bond-break control are needed. Which joint accessory is most suitable?
Next Question
A Sarasota trench will be 6 ft deep and employees must enter it. Which planning item is normally required unless the excavation is entirely in stable rock?