Before the inspection hold point, the team confirms that the project condition shows that exterior concrete faces wet exposure and freeze-thaw risk. Which concrete mix characteristic is appropriate?
Correct Answer
B) Use air-entrained exterior concrete
air-entrained exterior concrete best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
air-entrained exterior concrete best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The Sanford project has this chemical communication issue: crew has not been briefed before using solvent. Which safety control should be completed?
Next Question
At the storm-shelter entry vestibule, during the field-takeoff reconciliation, the parapet run requires 492 LF of aluminum counterflashing plus 6% waste. Stock comes in 10 ft pieces. How many pieces are required?