For the upcoming operation, the key field fact is that the project condition shows that water collected by flashing must drain out. Which cavity-wall accessory should govern the choice?
Correct Answer
B) Use weep openings at flashing
weep openings at flashing best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
weep openings at flashing best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Use continuous bed-joint reinforcement
Use continuous bed-joint reinforcement addresses a neighboring field issue, but not the condition or method control required for masonry cavity drainage.
Option C: Use mortar droppings in cavity
Use mortar droppings in cavity addresses a neighboring field issue, but not the condition or method control required for masonry cavity drainage.
Option D: Use rigid insulation blocking the exit
Use rigid insulation blocking the exit addresses a neighboring field issue, but not the condition or method control required for masonry cavity drainage.
Memory Technique
Condition is the clue; wall is the method check for Manager Checking.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Masonry wall methods; flashing and drainage coordination; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
The Eustis project has this cutting/welding condition: welding continues after fire watch leaves. Which fire-prevention control should be documented?
Next Question
The construction team is coordinating a method decision because membrane adhesion depends on substrate condition. Which roof substrate readiness is best?