The construction team is coordinating a method decision because accepted work still needs protection. Which closeout method is best?
Correct Answer
B) protect accepted finishes until turnover
protect accepted finishes until turnover best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
protect accepted finishes until turnover best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: remove protection as soon as finish is installed
remove protection as soon as finish is installed addresses a neighboring field issue, but not the condition or method control required for punch protection sequence.
Option C: use finished rooms as material storage
use finished rooms as material storage addresses a neighboring field issue, but not the condition or method control required for punch protection sequence.
Option D: delay protection until final cleaning
delay protection until final cleaning addresses a neighboring field issue, but not the condition or method control required for punch protection sequence.
Memory Technique
Controlling is the clue; condition is the method check for Foreman Selecting Tie the cue to Punch Protection Sequence Foreman.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Construction closeout methods; protection before turnover; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
