A Florida superintendent must choose the proper site-control material because sediment must be intercepted. Which option is best?
Correct Answer
C) silt fence or inlet protection as located
silt fence or inlet protection as located best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
silt fence or inlet protection as located best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: Material choice: stabilized construction entrance
Material choice: stabilized construction entrance addresses a neighboring field issue, but not the condition or method control required for temporary erosion control.
Option B: sediment basin or trap
sediment basin or trap addresses a neighboring field issue, but not the condition or method control required for temporary erosion control.
Option D: erosion-control blanket on slope
erosion-control blanket on slope addresses a neighboring field issue, but not the condition or method control required for temporary erosion control.
Memory Technique
Temporary Erosion method for Manager Checking: condition first, tool second.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Sitework methods; erosion and sediment control installation; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions · 70% to pass
Contract Administration
60 questions · 70% to pass
