In the look-ahead meeting, the constraint is that finished surfaces need compatible protection. Which protection material should the project team carry?
Correct Answer
D) specified floor protection compatible with finish
specified floor protection compatible with finish best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why This Is the Correct Answer
specified floor protection compatible with finish best matches the stated condition. The other choices are real construction options in the same family, but they fit different field conditions.
Why the Other Options Are Wrong
Option A: breathless plastic over curing floor
breathless plastic over curing floor belongs to a different file or record trail; it does not prove the temporary protection event.
Option B: adhesive tape directly on finished wood
adhesive tape directly on finished wood belongs to a different file or record trail; it does not prove the temporary protection event.
Option C: Material choice: unprotected cart traffic over new finish
Material choice: unprotected cart traffic over new finish belongs to a different file or record trail; it does not prove the temporary protection event.
Memory Technique
A record works only when it proves the exact controlling event for Foreman Selecting.
Reference Hint
Open-book path: tab Principles and Practices of Commercial Construction, 10th Edition to Material protection methods; finished work protection; verify the construction method, material selection, equipment choice, or work sequence that fits the field condition.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
During the look-ahead planning meeting at the clubhouse cart-storage bay, a reinforced slab panel is 81 ft by 14 ft by 5 in. Including 3% waste, how many cubic yards of concrete are needed?
Next Question
The Palm Bay project has this confined-space condition: crew will enter a manhole with limited entry. Which safety control should be completed before entry?