Project MgmtBlueprintsmedium17% of exam part

Using the drawing index, which sheet should you open for enlarged restrooms and interior elevations?

Correct Answer

C) A-401

The sheet index row with that title points to A-401.

Answer Options
A
A-101
B
A-121
C
A-401
D
S-101

Why This Is the Correct Answer

The sheet index row with that title points to A-401.

Why the Other Options Are Wrong

Option A: A-101

A-101 skips the written authority, scope, price, notice, or release control needed for drawing index navigation.

Option B: A-121

A-121 skips the written authority, scope, price, notice, or release control needed for drawing index navigation.

Option D: S-101

S-101 skips the written authority, scope, price, notice, or release control needed for drawing index navigation.

Memory Technique

When sheet clashes with row, let the contract speak before Start Plan.

Reference Hint

Open-book path: turn to sheet G-001 in the plan packet, then use the DRAWING INDEX note/table before checking P&P Commercial Construction plan-reading guidance.

Was this explanation helpful?

More Project Mgmt Questions

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your contractor license exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.