From the trash enclosure footing plan, what concrete volume is required?
Correct Answer
A) 8.3 cy
The footing volume is about 8.3 cubic yards.
Why This Is the Correct Answer
The footing volume is about 8.3 cubic yards.
Why the Other Options Are Wrong
Option B: 7.4 cy
7.4 cy is below the supported result for footing volume takeoff; it likely omits allowance, conversion, coverage, or final round-up.
Option C: 9.1 cy
9.1 cy is above the supported result for footing volume takeoff; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Option D: 10.2 cy
10.2 cy is above the supported result for footing volume takeoff; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Footing Volume Takeoff cart for Trash Enclosure: cubic first, yards second, whole cy last.
Reference Hint
Open-book path: turn to sheet S-106 in the plan packet, then use the TRASH ENCLOSURE FOOTING PLAN note/table before checking P&P Commercial Construction plan-reading guidance.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Related Study Resources
Previous Question
Using the drawing index, which sheet should you open for enlarged restrooms and interior elevations?
Next Question
For the subcontractor quantity check at the urgent-care ambulance canopy, the concrete washout solids produces 42 CY of solid waste volume, with 15% swell or handling allowance. Each container holds 10 CY. How many containers are required?