Which section of part 1926 carries the hazard communication requirements for construction?
Correct Answer
A) 1926.59
Section 1926.59 is the whole of it, and its text is a cross-reference: "The requirements applicable to construction work under this section are identical to those set forth at § 1910.1200 of this chapter." The number 1200 belongs to part 1910; there is no § 1926.1200. Section 1926.62 is lead and 1926.21 is safety training and education.
Why This Is the Correct Answer
Section 1926.59 is the whole of it, and its text is a cross-reference: "The requirements applicable to construction work under this section are identical to those set forth at § 1910.1200 of this chapter." The number 1200 belongs to part 1910; there is no § 1926.1200. Section 1926.62 is lead and 1926.21 is safety training and education.
Why the Other Options Are Wrong
Option B: 1926.1200
1200 belongs to part 1910; there is no 1926.1200.
Option C: 1926.21
1926.21 is safety training and education.
Option D: 1926.62
Section 1926.62 is the lead standard.
Independent practice; verify any reference hint against the edition and category permitted for your booking. Official exam and reference-list sources →
More Project Mgmt Questions
A sloped roof surface measures 7,360 square feet. Add 8% waste and express the result in 100-square-foot roofing squares, to the nearest 0.1 square.
Grinding metal creates flying-particle hazards to a worker’s eyes and face. Which PPE action addresses those hazards?
The project inspection plan requires in-wall rough-in approval before gypsum board conceals stud cavities. Which coordination item must be completed before close-in?
A low-slope roof detail requires base flashing continuous with the field membrane before its upper edge is counterflashed. The membrane-to-wall transition is not yet installed. Which listed step addresses that missing interface?
A membrane takeoff covers 13,720 square feet before 8% waste. Express the adjusted area in 100-square-foot roofing squares, to the nearest 0.1 square.
An office needs carpet tile over 9,975 square feet, plus one combined 15% allowance for waste and spare stock. Each carton supplies 48 square feet. How many whole cartons are needed?
A grout takeoff requires 11.5 cubic feet including its allowance. For this exercise, each bag yields 0.45 cubic foot. How many whole bags are needed?
A steel connection schedule identifies which joints require snug-tight installation and which require pretensioning. Which approach follows that schedule?
A sling’s required safe-working-load identification is illegible before a planned lift. Which action is required?
A supplied metal-deck takeoff calls for 18 approved pins per sheet over 175 sheets. Boxes contain 900 pins. With no additional allowance, how many whole boxes are required?
People Also Study