Which section of part 1926 carries the hazard communication requirements for construction?
Correct Answer
A) 1926.59
Section 1926.59 is the whole of it, and its text is a cross-reference: "The requirements applicable to construction work under this section are identical to those set forth at § 1910.1200 of this chapter." The number 1200 belongs to part 1910; there is no § 1926.1200. Section 1926.62 is lead and 1926.21 is safety training and education.
Why This Is the Correct Answer
Section 1926.59 is the whole of it, and its text is a cross-reference: "The requirements applicable to construction work under this section are identical to those set forth at § 1910.1200 of this chapter." The number 1200 belongs to part 1910; there is no § 1926.1200. Section 1926.62 is lead and 1926.21 is safety training and education.
More Project Mgmt Questions
The field condition is: the work should be released only if the team addresses that thermal movement must be accommodated. Which coping joint detail best matches the condition?
From the mechanical schedule, what CFM is listed for DOAS-2?
From panel schedule R1, what wire size is shown for circuit R1-5?
A subcontractor asks for direction after noting that the work should be released only if the team addresses that subgrade and aggregate must remain separated. Which geotextile selection best fits the work?
From the specialty item schedule, what height is listed for SP-3?
Using the drawing index, which sheet should you open for the entry wall footing plan?
From the plumbing fixture schedule, what waste size is listed for UR-1?
A Ocala task creates flying-particle exposure because a worker is cutting masonry. Which PPE control is required?
From the light fixture schedule, what mount is listed for L1?
From the loading strip dimension plan, what perimeter length is needed for edge restraint?
People Also Study
Business & Financial Management
120 questions · 70% to pass
Contract Administration
60 questions · 70% to pass
Related Study Resources
Previous Question
While preparing the preconstruction estimate lock for the county annex sally port, the curb angle is 240 ft long and anchor bolts are placed at 12 ft on center, including one at the starting end. How many anchor bolts are needed?
Next Question
A Lakeland excavation has this condition before entry: rain occurred before the morning shift. Which safety step is required before work proceeds?