A wood post schedule lists nominal 4x4 posts. What actual dressed cross-section should the field expect for a standard 4x4?
Correct Answer
A) 3-1/2 in. by 3-1/2 in.
A standard nominal 4x4 is dressed to an actual cross-section of 3-1/2 in. by 3-1/2 in. Other choices use rough nominal size or nonmatching framing sizes.
Why This Is the Correct Answer
A standard nominal 4x4 is dressed to an actual cross-section of 3-1/2 in. by 3-1/2 in. Other choices use rough nominal size or nonmatching framing sizes.
Why the Other Options Are Wrong
Option B: 4 in. by 4 in.
In wood framing, 4 in. by 4 in. is the wrong selection for Timber dimensions: 4 in. by 4 in. is a different published number than the cited Timber dimensions value; Dimensional lumber nominal and actual sizes supports 3-1/2 in. by 3-1/2 in.
Option C: 3 in. by 3 in.
The trap in C is 3 in. by 3 in. That selection is wrong because 3 in. by 3 in. is a different published number than the cited Timber dimensions value; Dimensional lumber nominal and actual sizes supports 3-1/2 in.
Option D: 3-5/8 in. by 3-5/8 in.
Choice D gives 3-5/8 in. by 3-5/8 in. Its specific error: 3-5/8 in. by 3-5/8 in. is a different published number than the cited Timber dimensions value; Dimensional lumber nominal and actual sizes supports 3-1/2 in.
Memory Technique
Make timber dimensions a tabbed card: cite the exact condition, then choose 3-1/2 in. by 3-1/2 in.
Reference Hint
Open Carpentry and Building Construction, 2016; use the index entry or section for "Dimensional lumber nominal and actual sizes" to confirm that A standard nominal 4x4 is dressed to an actual cross-section of 3-1/2 in.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass