A corridor needs resilient base on two 84-ft walls. How many linear feet of base are required before waste?
Correct Answer
D) 168 linear ft
Base length is 84 ft x 2 walls = 168 linear ft.
Why This Is the Correct Answer
Base length is 84 ft x 2 walls = 168 linear ft.
Why the Other Options Are Wrong
Option A: 84 linear ft
resilient base length, choice a: 84 gives 84 linear ft. That calculation copies a listed value without completing the operation.
Option B: 126 linear ft
resilient base length, choice b: 126 linear ft omits a required add-on/subtraction; the numeric gap is 42.
Option C: 336 linear ft
resilient base length, choice d: 336 linear ft is off by 168 from the checked result 168 linear ft because it misuses the 168 item (84 ft x 2 walls = 168 linear ft).
Memory Technique
Picture a ledger line labeled resilient base length: finish every operation before accepting 168 linear ft.
Reference Hint
Open Principles and Practices of Commercial Construction, 11th Ed., 2024; use by topic index - acoustical ceilings / paint / tile / resilient base to confirm that Base length is 84 ft x 2 walls = 168 linear ft.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
