A steel joist seat is 3/8 in. low and an approved shim pack will correct the seat elevation. What shim thickness is needed?
Correct Answer
D) 3/8 in.
A 3/8 in. low seat requires a 3/8 in. approved shim correction.
Why This Is the Correct Answer
A 3/8 in. low seat requires a 3/8 in. approved shim correction.
Why the Other Options Are Wrong
Option A: 1/8 in.
joist seat elevation shim, choice a: 1/8 in. backs into 2.67 when divided by 3/8; the accepted setup gives 8 on that same base.
Option B: 1/4 in.
joist seat elevation shim, choice b: 1/4 in. backs into 2.67 when divided by 3/8; the accepted setup gives 8 on that same base.
Option C: 3/4 in.
joist seat elevation shim, choice d: 3/4 in. repeats the numeric result but changes the required label or rounding.
Memory Technique
Keep a badge beside joist seat elevation shim: if one number is skipped, the option drifts away from 3/8 in.
Reference Hint
Open Steel Construction Manual, 15th Ed.; Steel Deck Institute and Steel Joist Institute standard practice; use the index entry or section for "Joist seat elevation adjustment" to confirm that A 3/8 in.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?