A roof drain is 44 ft from a high point, and tapered insulation is set at 1/4 in. per foot. What elevation drop should the cricket provide?
Correct Answer
A) 11 in.
At 1/4 in. per foot over 44 ft, the drop is 44 x 0.25 = 11 in. Other choices use shorter runs or round to a convenient foot.
Why This Is the Correct Answer
At 1/4 in. per foot over 44 ft, the drop is 44 x 0.25 = 11 in. Other choices use shorter runs or round to a convenient foot.
Why the Other Options Are Wrong
Option B: 9 in.
roof drain slope, choice a: 9 in. backs into 36 when divided by 1/4; the accepted setup gives 44 on that same base.
Option C: 10 in.
roof drain slope, choice b: 10 in. backs into 40 when divided by 1/4; the accepted setup gives 44 on that same base.
Option D: 12 in.
roof drain slope, choice d: 12 in. backs into 48 when divided by 1/4; the accepted setup gives 44 on that same base.
Memory Technique
Store roof drain slope with its last math move; nearby answers are usually unfinished versions of 11 in.
Reference Hint
Open Roofing Construction and Estimating, Atcheson, 1995/2022 reprint; use the index entry or section for "Roof taper slope to drain calculation" to confirm that At 1/4 in.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
