Inlet protection is causing ponding that threatens traffic safety. What is the right response?
Correct Answer
A) Modify or maintain the BMP so sediment is controlled without creating unsafe flooding.
BMPs must control sediment while preserving safe drainage.
Why This Is the Correct Answer
BMPs must control sediment while preserving safe drainage.
Why the Other Options Are Wrong
Option B: Leave flooding because sediment control always overrides safety
Choice B gives Leave flooding because sediment control always overrides safety. Its specific error: the choice would not get the project to Modify or maintain the BMP so sediment is controlled without creating unsafe flooding.
Option C: The site crew should remove all stormwater controls permanently
Choice C (Remove all stormwater controls permanently.) is rejected because the option does not produce the required Inlet protection flooding outcome, Modify or maintain the BMP so sediment is controlled without creating unsafe flooding.
Option D: Pump muddy water directly to the creek, leaving inlet protection flooding unverified
In site construction, Pump muddy water directly to the creek. is the wrong selection for Inlet protection flooding: it points to Pump muddy water directly to the creek. but.
Memory Technique
Tag the scene with inlet protection flooding: wrong actor or wrong timing means the fix is not Modify or maintain the BMP so sediment is controlled without creating unsafe flooding.
Reference Hint
Open Developing Your Stormwater Pollution Prevention Plan, EPA 833-R-06-004, 2007; use the index entry or section for "EPA 833-R-06-004 - erosion and sediment controls" to confirm that BMPs must control sediment while preserving safe drainage.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass