What does field density testing compare against?
Correct Answer
D) The specified compaction requirement based on laboratory moisture-density data
Field density tests are compared to specified compaction requirements, often based on Proctor data.
Why This Is the Correct Answer
Field density tests are compared to specified compaction requirements, often based on Proctor data.
Why the Other Options Are Wrong
Option A: Compare field density only with the contractor's visual proof-roll result
Choice A gives Door swing. Its specific error: the option shifts to a different trade task; the tested Field density control function or field correction is The specified compaction requirement based on laboratory moisture-density data.
Option B: Treat the item as a closeout correction tied to field density control
Choice B (Bid protest timing) is rejected because it shifts the question into contract administration money flow.
Option C: Compare field density with fill delivery tickets rather than an in-place test result
In site construction, Fire damper access is the wrong selection for Field density control: the option does not produce the required Field density control outcome, The specified compaction requirement based on laboratory moisture-density data.
Memory Technique
Make field density control a purpose cue; if the choice changes the purpose, it cannot be The specified compaction requirement based on laboratory moisture-density data.
Reference Hint
Open Pipe and Excavation Contracting, 2011; use by topic index - bedding / backfill / compaction to confirm that Field density tests are compared to specified compaction requirements, often based on Proctor data.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass