A warranted door hardware failure occurs after turnover. What should the owner issue or contractor document?
Correct Answer
A) A warranty service request identifying the defect, date, location, and required correction.
Warranty correction should be documented with enough information to evaluate and perform the obligation.
Why This Is the Correct Answer
Warranty correction should be documented with enough information to evaluate and perform the obligation.
Why the Other Options Are Wrong
Option B: Classify the condition as a new bid bond as a bonding paperwork issue that controls warranty correction notice
Choice B gives A new bid bond. Its specific error: it names a financial document or payment mechanism, not the Warranty correction notice action/result stated by A warranty service request identifying the defect, date, location, and required correction.
Option C: Accept the price information as submitted and leave warranty correction notice unverified
Choice C (A deleted addendum) is rejected because the option tries to substitute, waive, or delete the Warranty correction notice control; the item instead requires A warranty service request identifying the defect, date, location, and required correction.
Option D: Classify the condition as a noncollusion affidavit, leaving warranty correction notice unverified
In procurement and contracting, A noncollusion affidavit is the wrong selection for Warranty correction notice: the option does not produce the required Warranty correction notice outcome, A warranty service request identifying the defect, date, location, and required correction.
Memory Technique
Use the phrase "problem, control, result" for warranty correction notice; the result side is A warranty service request identifying the defect, date, location, and required correction.
Reference Hint
Open NASCLA Contractors Guide to Business, Law and Project Management, 14th Ed.; use the index entry or section for "Warranty service requests" to confirm that Warranty correction should be documented with enough information to evaluate and perform the obligation.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass