A contractor requests final payment but record drawings and warranties are missing. What is the issue?
Correct Answer
D) Closeout deliverables required before final payment are incomplete.
Final payment is commonly conditioned on required closeout documents.
Why This Is the Correct Answer
Final payment is commonly conditioned on required closeout documents.
Why the Other Options Are Wrong
Option A: Apply bid security is too low to the final payment closeout condition
In procurement and contracting, Bid security is too low is the wrong selection for Final payment closeout: the option answers a paperwork, payment, or bonding issue.
Option B: The prebid meeting was too long
The trap in B is The prebid meeting was too long. That selection is wrong because it shifts the question into contract administration money flow.
Option C: The OSHA poster is missing from the bid, leaving final payment closeout unverified
Choice C gives The OSHA poster is missing from the bid. Its specific error: it names a financial document or payment mechanism, not the Final payment closeout action/result stated by Closeout deliverables required before final payment are incomplete.
Memory Technique
Pair final payment closeout with the real field trigger, then choose the response that produces Closeout deliverables required before final payment are incomplete.
Reference Hint
Open NASCLA Contractors Guide to Business, Law and Project Management, 14th Ed.; use the index entry or section for "Final payment requirements" to confirm that Final payment is commonly conditioned on required closeout documents.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?