The low bidder has unresolved default history and lacks required licenses. What evaluation issue is raised?
Correct Answer
D) Bidder responsibility.
Responsibility concerns the bidder's capacity, qualifications, integrity, and ability to perform.
Why This Is the Correct Answer
Responsibility concerns the bidder's capacity, qualifications, integrity, and ability to perform.
Why the Other Options Are Wrong
Option A: Bid arithmetic only
The trap in A is Bid arithmetic only. That selection is wrong because it leaves the work at an informal or incomplete stage, while Responsibility concern requires Bidder responsibility.; Licensing and performance capacity are responsibility issues.
Option B: A warranty call
Choice B gives A warranty call. Its specific error: it leaves out the controlling Responsibility concern result: Bidder responsibility.
Option C: A stored-material invoice
Choice C (A stored-material invoice.) is rejected because it names a financial document or payment mechanism, not the Responsibility concern action/result stated by Bidder responsibility. The cited answer is Bidder responsibility.
Memory Technique
Remember responsibility concern by its jobsite consequence: the correct move points to Bidder responsibility.
Reference Hint
Open NASCLA Contractors Guide to Business, Law and Project Management, 14th Ed.; use the index entry or section for "Bidder responsibility" to confirm that Responsibility concerns the bidder's capacity, qualifications, integrity, and ability to perform.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?