For the owner coordination call, what does bidder responsibility primarily measure?
Correct Answer
D) Capability and qualifications to perform
Capability and qualifications to perform is the correct meaning of responsibility in this construction context for concept item 473. Other choices: the distractors describe unrelated administration, payment, or closeout ideas.
Why This Is the Correct Answer
Capability and qualifications to perform is the correct meaning of responsibility in this construction context for concept item 473.
Why the Other Options Are Wrong
Option A: Base the responsibility response on arithmetic only
In procurement and contracting, Arithmetic only is the wrong selection for Responsibility: the option delays or omits the controlling step.
Option B: Limit responsibility to final lien release
The trap in B is Final lien release. That selection is wrong because it leaves out the controlling Responsibility result.
Option C: Limit responsibility to door hardware finish
Choice C gives Door hardware finish. Its specific error: it describes work from another assembly, while the Responsibility item is asking.
Memory Technique
Make responsibility a purpose cue; if the choice changes the purpose, it cannot be Capability and qualifications to perform.
Reference Hint
Open Construction Project Management, 5th Ed. (2022); use the index entry or section for "Bidder responsibility" to confirm that Capability and qualifications to perform is the correct meaning of responsibility in this construction context for concept item 473.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass