A subcontractor has not yet received the current progress payment. Which waiver form best matches the situation?
Correct Answer
D) A conditional waiver tied to receipt of payment.
A conditional waiver avoids releasing lien rights until payment is received.
Why This Is the Correct Answer
A conditional waiver avoids releasing lien rights until payment is received.
Why the Other Options Are Wrong
Option A: Classify it as an unconditional final waiver
Choice A gives An unconditional final waiver. Its specific error: it removes the controlling Conditional waiver with progress pay requirement instead of meeting it.
Option B: Classify it as a bid bond
Choice B (A bid bond) is rejected because it names a financial document or payment mechanism, not the Conditional waiver with progress pay action/result stated by A conditional waiver tied to receipt of payment.
Option C: Classify it as a substitution request
In procurement and contracting, A substitution request is the wrong selection for Conditional waiver with progress pay: the choice would not get the project to A conditional waiver tied to receipt of payment.
Memory Technique
Remember conditional waiver with progress pay by its jobsite consequence: the correct move points to A conditional waiver tied to receipt of payment.
Reference Hint
Open NASCLA Contractors Guide to Business, Law and Project Management, 14th Ed.; use the index entry or section for "Progress-payment lien waivers" to confirm that A conditional waiver avoids releasing lien rights until payment is received.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?