The contract allows retainage on progress payments. What does retainage mean in pay-application administration?
Correct Answer
B) A portion of earned payment withheld until later contract milestones or completion
Retainage is a withheld portion of otherwise earned progress payment, held until later milestones or completion under the contract. Other choices confuse retainage with bonuses, taxes, or bid structure.
Why This Is the Correct Answer
Retainage is a withheld portion of otherwise earned progress payment, held until later milestones or completion under the contract. Other choices confuse retainage with bonuses, taxes, or bid structure.
Why the Other Options Are Wrong
Option A: Classify the condition as a bonus paid before mobilization
In procurement and contracting, A bonus paid before mobilization is the wrong selection for Retainage: the choice would not get the project to A portion of earned payment withheld until later contract milestones or completion, which is the Retainage result verified by the source.
Option C: Classify the condition as a sales tax exemption for materials
Choice C gives A sales tax exemption for materials. Its specific error: it points to A sales tax exemption for materials, but.
Option D: Classify it as a separate bid alternate
Choice D (A separate bid alternate) is rejected because it names a financial document or payment mechanism, not the Retainage action/result stated by A portion of earned payment withheld until later contract milestones or completion.
Memory Technique
File retainage under a inspection mark: condition first, number or duty second, answer A portion of earned payment withheld until later contract milestones or completion.
Reference Hint
Open NASCLA Contractors Guide to Business, Law and Project Management, 14th Ed.; use the index entry or section for "Retainage in progress payments" to confirm that Retainage is a withheld portion of otherwise earned progress payment, held until later milestones or completion under the contract.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass