The lowest bid omits the required bid-form signature, while the instructions state unsigned bids may be rejected. What is the proper review issue?
Correct Answer
A) Whether the omission makes the bid nonresponsive under the bidding instructions
A missing required signature can make a bid nonresponsive when the bidding instructions make the signature material. Other choices do not address bid responsiveness.
Why This Is the Correct Answer
A missing required signature can make a bid nonresponsive when the bidding instructions make the signature material. Other choices do not address bid responsiveness.
Why the Other Options Are Wrong
Option B: Whether the owner can ignore all bid forms
Choice B gives Whether the owner can ignore all bid forms. Its specific error: it leaves the work at an informal or incomplete stage, while Missing signature requires Whether the omission makes the bid nonresponsive under the bidding instructions.
Option C: Whether the bid should be converted to warranty work
Choice C (Whether the bid should be converted to warranty work) is rejected because it shifts the question into contract administration money flow.
Option D: Accept the price information as submitted and leave missing signature unverified
In procurement and contracting, Whether the architect can delete the project scope is the wrong selection for Missing signature: it treats Missing signature as optional.
Memory Technique
Pair missing signature with the real field trigger, then choose the response that produces Whether the omission makes the bid nonresponsive under the bidding instructions.
Reference Hint
Open NASCLA Contractors Guide to Business, Law and Project Management, 14th Ed.; use the index entry or section for "Bid form signature and responsiveness" to confirm that A missing required signature can make a bid nonresponsive when the bidding instructions make the signature material.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
A plumber lays out a water closet centerline beside a side wall. What minimum centerline clearance to the side obstruction is commonly checked?
Next Question
A vibrator is used carefully around congested reinforcing in a wall lift. The main purpose of consolidation is to accomplish which result?