The ASI bubble is tied to the revised storefront sill detail. Which sketch number is printed beside it?
Correct Answer
A) SK-17
The target graphic marker on Sheet G-916 points to SK-17; the other choices are visible but tied to different markers.
Why This Is the Correct Answer
The target graphic marker on Sheet G-916 points to SK-17; the other choices are visible but tied to different markers.
Why the Other Options Are Wrong
Option B: SK-04
SK-04 is printed elsewhere on this navigation excerpt, but its graphic marker is not attached to the target condition.
Option C: SK-09
SK-09 is printed elsewhere on this navigation excerpt, but its graphic marker is not attached to the target condition.
Option D: SK-22
SK-22 is printed elsewhere on this navigation excerpt, but its graphic marker is not attached to the target condition.
Memory Technique
Graphic ownership rule for asi sketch link: one marker owns one label.
Reference Hint
Open Sheet G-916; follow the leader, cloud, boundary, or hatch marker to its printed label.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
