The triangular delta on the stair opening matches which revision entry in the title block?
Correct Answer
D) REV 5 - East stair opening
The target graphic marker on Sheet G-911 points to REV 5 - East stair opening; the other choices are visible but tied to different markers.
Why This Is the Correct Answer
The target graphic marker on Sheet G-911 points to REV 5 - East stair opening; the other choices are visible but tied to different markers.
Why the Other Options Are Wrong
Option A: REV 2 - Lobby ceiling
REV 2 - Lobby ceiling is printed elsewhere on this navigation excerpt, but its graphic marker is not attached to the target condition.
Option B: REV 3 - Door hardware
REV 3 - Door hardware is printed elsewhere on this navigation excerpt, but its graphic marker is not attached to the target condition.
Option C: REV 4 - Roof drain
REV 4 - Roof drain is printed elsewhere on this navigation excerpt, but its graphic marker is not attached to the target condition.
Memory Technique
Marker memory for revision delta: choose the label the graphic owns.
Reference Hint
Open Sheet G-911; follow the leader, cloud, boundary, or hatch marker to its printed label.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?