Which sheet entry should be opened for the listed scope in the drawing index?
Correct Answer
C) E-401 Panel Schedules
The answer is printed in the drawing index excerpt as E-401 Panel Schedules; the other listed entries belong to different rows or boundaries.
Why This Is the Correct Answer
The answer is printed in the drawing index excerpt as E-401 Panel Schedules; the other listed entries belong to different rows or boundaries.
Why the Other Options Are Wrong
Option A: A-101 Floor Plan
A-101 Floor Plan appears elsewhere on the same drawing index excerpt, but it is not the marked condition being asked.
Option B: S-201 Framing Plan
S-201 Framing Plan appears elsewhere on the same drawing index excerpt, but it is not the marked condition being asked.
Option D: M-301 Riser Diagram
M-301 Riser Diagram appears elsewhere on the same drawing index excerpt, but it is not the marked condition being asked.
Memory Technique
Marker memory for drawing index: choose the label the graphic owns.
Reference Hint
Open Sheet G-835; read the drawing index excerpt and choose the entry attached to the marked condition.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?