What total vertical dimension is shown for the plumbing riser assembly?
Correct Answer
D) 22 ft
The assembly height is the sum of the three printed vertical dimensions, 22 ft.
Why This Is the Correct Answer
The assembly height is the sum of the three printed vertical dimensions, 22 ft.
Why the Other Options Are Wrong
Option A: 18 ft
This omits the top vertical segment.
Option B: 25 ft
This adds an extra 3 ft that is not dimensioned.
Option C: 16 ft
This omits the base segment from the total.
Memory Technique
Vertical detail rule for plumbing riser vertical: printed side callouts beat visual height on P-765.
Reference Hint
Open Sheet P-765; add the three vertical dimension strings on the right side of the detail.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?