What net plan area is shown for the L-shaped washout access pad?
Correct Answer
B) 1,732 sf
The missing corner must be removed from the outside rectangular footprint.
Why This Is the Correct Answer
The missing corner must be removed from the outside rectangular footprint.
Why the Other Options Are Wrong
Option A: 1,900 sf
Choice A is the outside rectangle before removing the 12 ft by 14 ft notch.
Option C: 168 sf
Choice C is only the notched-out corner area.
Option D: 1,564 sf
Choice D subtracts the 168 sf notch twice.
Memory Technique
For l-shaped washout access area, subtract only the labeled void; the rest of the outer outline stays in the area.
Reference Hint
Open Sheet C-234; locate the named site feature and use the shown dimensions or scale bar exactly as described.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
