Using the staging pad dimensions shown, what is the plan area of the pad?
Correct Answer
B) 836 sf
The staging pad area comes from multiplying the shown length and width dimensions.
Why This Is the Correct Answer
The staging pad area comes from multiplying the shown length and width dimensions.
Why the Other Options Are Wrong
Option A: 60 sf
Choice A adds 38 ft and 22 ft instead of multiplying length by width for area.
Option C: 760 sf
Choice C uses 20 ft as the width rather than the 22 ft dimension shown on the plan.
Option D: 1,672 sf
Choice D doubles the pad area even though only one pad outline is shown.
Memory Technique
Printed-edge rule for temporary staging pad: dimensions make the area; scale does not.
Reference Hint
Open Sheet C-116; identify whether the figure asks for a segment, sum, scale-bar estimate, or area calculation.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?