On the finish plan, locate room R315; then use the finish schedule. What base is listed?
Correct Answer
C) NO BASE
Sheet F-803 shows R315 on the plan excerpt; the matching schedule row lists NO BASE in the Base column.
Why This Is the Correct Answer
Sheet F-803 shows R315 on the plan excerpt; the matching schedule row lists NO BASE in the Base column.
Why the Other Options Are Wrong
Option A: INTEGRAL BASE
INTEGRAL BASE is the base entry for R312, not for the mark located on the plan.
Option B: RB-1
RB-1 is the base entry for R313, not for the mark located on the plan.
Option D: TILE BASE
TILE BASE is the base entry for R314, not for the mark located on the plan.
Memory Technique
Plan-to-table hook for finish and 04: tag R315 selects the row; Base supplies the field.
Reference Hint
Open Sheet F-803; locate R315 in the plan excerpt before reading the schedule row.
More NASCLA Questions
Bid instructions require bid security with each sealed bid. Which purpose should the estimator associate with that requirement?
A wood deck surface has 320 sf of coverage. Boards have a 5-1/2 in. actual face width, and the order includes an 8 percent cutting allowance. What linear footage is closest?
Using the dimensions shown for the stabilized construction entrance, what is the plan area?
A reroof area requires 14,720 sf of rigid insulation. Boards are 4 ft by 8 ft, and the order includes 5 percent waste. How many boards are needed?
Two addenda revise the drawings before bid day. What must a responsive bidder normally do with those addenda?
A utility trench is 180 ft long, 3 ft wide, and 7 ft deep with vertical sides inside a trench shield. What excavation volume is required?
A 120 ft long Type C trench is cut with a 4 ft bottom width and a 6 ft depth. If side slopes are 1-1/2 horizontal to 1 vertical, what excavation volume is closest?
A storm pipe run needs 240 ft of bedding, 4 ft wide and 6 in. thick. Including a 10 percent ordering allowance, how many cubic yards of bedding aggregate are needed?
A mass excavation produces 1,180 loose cubic yards of material for off-site disposal. End-dump trucks can haul 18 loose cubic yards per trip. What truck count is required?
An asphalt-shingle roof has a slope of 3:12. Under the IBC low-slope asphalt-shingle provisions, what underlayment arrangement is required?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
A contract allows 10 percent overhead and then 5 percent profit on a $18,000 direct-cost change. If profit is applied after overhead, what total proposal amount results?
Next Question
A supplier invoice is $48,000 with a 2 percent discount if paid within the discount period. What discounted payment amount applies?